SKU: FFDFFDADLLSET

Full Force FFDADLLSET Reman Stock Injectors 7AD Injectors & 1 AE Long Lead Injector | 1999-2003 Ford F250/F350 7.3L Powerstroke

Ships From Manufacturer in 3-5 Days
Confirmed fitment below
YEARS
1999-2003
MAKE / MODEL
Ford / Super Duty
SERIES
F250/F350
ENGINE
7.3L Powerstroke
Price
$1,175
or
American Express
Apple Pay
Diners Club
Discover
Google Pay
Mastercard
PayPal
Shop Pay
Visa
Free Shipping
ORDERS $70+
Easy Returns
HASSLE-FREE
Earn Rewards
ALLIGATOR POINTS
Not sure this fits your build?
Our diesel experts know these trucks. Call or chat before you buy.
1-208-719-7400

PRODUCT DETAIL

Key Features & Description

Features:
  • Complete set of 8
  • 100% Remanufactured
  • New Internal Parts
  • Flow Tested Within 1%
  • New Internal Parts
  • 18-Month, Unlimited Mileage Warranty

Restore Your Powerstroke's Performance

After years and years of adventures with your 1999-2003 Ford 7.3L Powerstroke, you may begin to experience more rough idling, poor acceleration performance, and a drastic drop in fuel economy. This is typically a sign that your fuel injectors are failing. Fortunately, Full Force Diesel offers the perfect solution with their Remanufactured 7AD Stock Injectors & 1 AE Long Lead Injector. These injectors are expertly remanufactured using advanced techniques and strict quality control processes to ensure that they meet the original performance standards. Instead of opting for expensive, brand-new injectors, Full Force Diesel's remanufactured injectors offer an eco-friendly and cost-effective alternative, giving your truck a new lease on life. Whether you're towing heavy loads or just cruising the streets, these injectors are built to restore lost performance, improve throttle response, and get your fuel economy back on track.

Brand New Internal Parts for Ultimate Reliability

As a part of the remanufacturing process, the Remanufactured 7AD Stock Injectors & 1 AE Long Lead Injector from Full Force are completely disassembled and thoroughly inspected to ensure they meet the highest quality standards. Every injector is carefully examined, and all tolerances are checked to ensure they fall within factory specifications. If any component is found to be out of spec, it is replaced with new, high-quality parts to restore the injector to optimal condition. Every injector also gets new spring assemblies, plunger and barrel assembly, new stock nozzles, and various other new parts as needed. Once rebuilt, the injectors undergo strict flow testing to verify that each one is delivering fuel at an identical rate, matching within 1% of each other. This ensures even fuel distribution across all cylinders. Furthermore, these injectors come as a complete set of 8, designed to be a direct replacement for the original parts in your 7.3L Powerstroke engine. And unlike their competitors, Full Force Diesel does not charge any additional fees for core repairs or reconditioning. What you see is what you get, no hidden costs.

Vehicle Fitment: 1999, 2000, 2001, 2002, 2003 Ford 7.3L Powerstroke

Application Notes:
  • Shipping charges include a return label for your cores, if you have not selected to send in cores first.
  • If you have selected to send in cores first before your product ships it is the customers responsibility to ship cores to our facility.
  • Coked cores are the result of vegetable oil and will not be accepted.
  • Build date after 12/98 for AD injectors

FITMENT GUIDE

Exact Fitment — Verify Your Year

Year RangesYears
Make
Model
Series
Engine
1999-2003
Ford
Super Duty
F250/F350
7.3L Powerstroke

CUSTOMER REVIEWS

What Buyers Say

Call a Diesel Expert, we'll find the right fit for your build

Not sure this part is right for your truck? Our team knows these platforms inside out. No hold music, no scripts.

Chat with Us